• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Vacuum Distillation of Crude Coal Tar(SPECIFICALLY CREOSOTE OIL)
Vacuum Distillation of Crude Coal Tar(SPECIFICALLY CREOSOTE OIL)

Vacuum distillation is the distillation process of separating liquids boiling above 150°C at 1 atm from Nonvolatile impurities. Another ... Read More

Capacity :
Creosote Oil 1875 MT/Annum,Phenolic or Carbolic Oil 300 MT/Annum,Naphthalic Oil 900 MT/Annum,Wash Oi
Plant and Machinery cost:
149.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
33.00 %
TCI :
323.00 Lakhs
Cost of Project :
323.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER AND PET BOTTLES
PACKAGED DRINKING WATER AND PET BOTTLES

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
6,00,00,000 Bottles/Annum
Plant and Machinery cost:
217.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
60.00 %
TCI :
455.00 Lakhs
Cost of Project :
455.00Lakhs
Add To Inquiry Basket
TYRES AND TUBES FOR BICYCLE AND RICKSHAW
TYRES AND TUBES FOR BICYCLE AND RICKSHAW

Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and ... Read More

Capacity :
300000 Nos. Tyres & 300000 Nos. Tubes
Plant and Machinery cost:
158.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
53.00 %
TCI :
351.00 Lakhs
Cost of Project :
351.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC SYRINGES
DISPOSABLE PLASTIC SYRINGES

A plastic syringe is a cylindrical t... Read More

Capacity :
22500000 Nos. 5 Ml Size/Annum, 22500000 Nos. 10 Ml Size/Annum
Plant and Machinery cost:
636.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
42.00 %
TCI :
837.00 Lakhs
Cost of Project :
837.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC CUPS, PLATES AND GLASSES
DISPOSABLE PLASTIC CUPS, PLATES AND GLASSES

The plastic industry in India plays a very important and key role in industrialization. Disposable cups, glasses, plates are used in daily life now... Read More

Capacity :
150 Lakhs Pcs/Annum Cups, 300 Lakhs Pcs/Annum Glass, 150 Lakhs Pcs/Annum Plates
Plant and Machinery cost:
34.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
48.00 %
TCI :
104.00 Lakhs
Cost of Project :
104.00Lakhs
Add To Inquiry Basket
E Waste Recycling plant (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))
E Waste Recycling plant (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))

E-waste is a popular informal name for electronic product nearing the end of their useful life. Computers, televisions, VCR, stereos, copier, and f... Read More

Capacity :
Monitor -10 Pcs/Day, Plastic Dana “ 5.33 M.T/Day,Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen and nitrogen are the most important industrial gases finding its application in large quantities in metal fabrication and cutting industries... Read More

Capacity :
1200 Cubic Meter/Day
Plant and Machinery cost:
21.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
52.00 %
TCI :
68.00 Lakhs
Cost of Project :
68.00Lakhs
Add To Inquiry Basket
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity :
Monitor -10 Pcs/Day, Plastic Granules – 5.33 M.T/Day, Copper Wire Scrap-9 Kg/day, Glass Scrap
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
Single Super Phosphate
Single Super Phosphate

Single Super Phosphate (SSP) Fertilizer industry is the pioneering fertilizer industry in the country and the first SSP plant is said to have been ... Read More

Capacity :
66000.00 MT/Annum
Plant and Machinery cost:
318.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
54.00%
Break Even Point (BEP):
35.00 %
TCI :
2000.00 Lakhs
Cost of Project :
2000.00Lakhs
Add To Inquiry Basket
INTEGRATED PRODUCTION UNIT OF GYPSUM POWDER, GYPSUM BOARD AND PVC LAMINATED GYPSUM CEILING TILES
INTEGRATED PRODUCTION UNIT OF GYPSUM POWDER, GYPSUM BOARD AND PVC LAMINATED GYPSUM CEILING TILES

INTEGRATED PRODUCTION UNIT OF GYPSUM POWDER, GYPSUM BOARD AND P.V.C. LAMINATED GYPSUM CEILING TILES... Read More

Capacity :
60,000 MT / A (Gypsum Powder), 3000 Thousand Sq. MT/A (Gypsum Board),600 Thousands Sq. MT/A (PVC Lam
Plant and Machinery cost:
840.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
57.00 %
TCI :
2352.00 Lakhs
Cost of Project :
2352.00Lakhs
Add To Inquiry Basket
IRON ORE PELLETIZATION PLANT
IRON ORE PELLETIZATION PLANT

Iron ore pellets are used in blast / electric furnaces for producing sponge iron and steels. Market by high productivity, lower fuel consumption an... Read More

Capacity :
1008000 MT/Annum
Plant and Machinery cost:
13800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
55.00 %
TCI :
22400.00 Lakhs
Cost of Project :
22400.00Lakhs
Add To Inquiry Basket
Bicycle Plant
Bicycle Plant

As a machine, the bicycle is found to deliver about 75 watts, travelling at 18 kmph on a sustained basis, although on a very short term basis power... Read More

Capacity :
7000 Nos. / Day
Plant and Machinery cost:
5718.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
47.00 %
TCI :
7861.00 Lakhs
Cost of Project :
7861.00Lakhs
Add To Inquiry Basket
TRADING OF IRON ORES
TRADING OF IRON ORES

Steel is considered to be the strongest material in that price. Day to day life and growth of industry and infrastructure in any country totally de... Read More

Capacity :
5000 MT/Day
Plant and Machinery cost:
156.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
52.00%
Break Even Point (BEP):
21.00 %
TCI :
2396.00 Lakhs
Cost of Project :
2396.00Lakhs
Add To Inquiry Basket
Petroleum Coke
Petroleum Coke

It is dark solid form of carbon, produced from the thermal decomposition and polymerization of heavy liquid hydrocarbons that are derived from crud... Read More

Capacity :
30.00 MT/day
Plant and Machinery cost:
271.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
49.00%
Break Even Point (BEP):
39.00 %
TCI :
1386.00 Lakhs
Cost of Project :
1386.00Lakhs
Add To Inquiry Basket
Coal Mining
Coal Mining

Coal is an extremely heterogeneous, complex material that is difficult to characterize. Coal is a rock formed by geological process and is composed... Read More

Capacity :
1350 Lakh MT/Annum (Job Work)
Plant and Machinery cost:
75200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
42.00 %
TCI :
97200.00 Lakhs
Cost of Project :
97200.00Lakhs
Add To Inquiry Basket
Gold and Silver Jewellery
Gold and Silver Jewellery

Gold is more than a precious metal in Indian culture and is truly entrenched in their belief system. Over centuries and millennia, gold has become ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Bioplastic Products
Production of Bioplastic Products

Production of Bioplastic Products. Biodegradable and Bio-Plastics Products Manufacturing Business. Glasse... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Filter (for All Vehicles)
Filter (for All Vehicles)

Filters containing an absorbent or catalyst such as charcoal (carbon) may also remove odors and gaseous pollutants such as volatile organic compoun... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Plastic Waste Recycling Plant
Plastic Waste Recycling Plant

Plastics are made... Read More

Capacity :
Plastic Granules : 2400 Kgs/Day PET Granules : 2400 Kgs/Day
Plant and Machinery cost:
97.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
238.00Lakhs
Add To Inquiry Basket
Production of PROM (Phosphate Rich Organic Manure)
Production of PROM (Phosphate Rich Organic Manure)

Production of PROM (Phosphate Rich Organic Manure): An Emerging Biofertilizer, Manufacturing of PROM Ferti... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes (2ml, 5ml, 10ml and 50ml)
Disposable Plastic Syringes (2ml, 5ml, 10ml and 50ml)

Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to their ... Read More

Capacity :
Disposable Plastic Syringes 2 ml Size : 350 Boxes/day Disposable Plastic Syringes 5 ml Size : 350 Bo
Plant and Machinery cost:
151.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
343.00Lakhs
Add To Inquiry Basket
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller
Solar Panel Assembling & Solar Power Inverter on Grid, Off Grid WithSolar Pump Controller

A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy.Solar panels generate free power ... Read More

Capacity :
Poly Crystaline Solar PV Modules Cap10 Watt: 1,200,000 Nos/Annum Poly Crystaline Solar PV Module Cap
Plant and Machinery cost:
1225.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
1674.00 Lakhs
Cost of Project :
1674.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes are made of plas... Read More

Capacity :
Disposable Plastic Syringes 2 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 5 ml Size
Plant and Machinery cost:
802.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
44.00 %
TCI :
1474.00 Lakhs
Cost of Project :
1474.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a description of surplus, obsolete, broken or discarded... Read More

Capacity :
Copper Wire: 500mt/annum Plastic Granules: 2230mt/annum Glass: 970mt/annum Ferrous Metal: 800mt/annu
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
51800000.00Lakhs
Add To Inquiry Basket
Biomedical Waste Recycling
Biomedical Waste Recycling

Biomedical waste is waste that is either putrescible or potentially infectious. Biomedical waste may also include waste associated with the generat... Read More

Capacity :
Plastic Granules 3 MT/Day •Recycled Paper 3 MT/Day •Recycled Glass 1 MT/Day •Recycled Metal 0.50 MT/
Plant and Machinery cost:
214.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.65%
Break Even Point (BEP):
52.47 %
TCI :
1182.00 Lakhs
Cost of Project :
1182.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Bicycle Tubes
Bicycle Tubes

Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyre... Read More

Capacity :
Bicycle Tubes: 10,000 Nos. /Day
Plant and Machinery cost:
118.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
622.00 Lakhs
Cost of Project :
622.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes with Needles
Disposable Plastic Syringes with Needles

Disposable Syringes made of plastic ... Read More

Capacity :
Syringes (1 ml) :14,000.0 Nos./Day.,Syringes (3 ml):14,000.0 Nos./Day.,Syringes (5 ml):14,000.0 Nos.
Plant and Machinery cost:
174.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
40.00 %
TCI :
515.00 Lakhs
Cost of Project :
515.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water

Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and us... Read More

Capacity :
210 Lakhs Nos. /annum
Plant and Machinery cost:
719.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
56.00 %
TCI :
1736.00 Lakhs
Cost of Project :
1736.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

E-waste is a popular, informal name for electronic products nearing the end of their useful life. While there is no generally accepted definition o... Read More

Capacity :
2164500 kgs. /annum
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.91%
Break Even Point (BEP):
49.81 %
TCI :
500.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
ELECTROLYTIC MANGANESE DIOXIDE
ELECTROLYTIC MANGANESE DIOXIDE

EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
E Waste Recycling Plant
E Waste Recycling Plant

E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, a... Read More

Capacity :
5 MT/Day
Plant and Machinery cost:
60.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
15.00%
Break Even Point (BEP):
43.00 %
TCI :
241.00 Lakhs
Cost of Project :
241.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water with PET Bottles
Packaged Drinking Water with PET Bottles
Profile Water forms an essential part of every human being. Since it is a human necessity it makes best sense to do business in. As a normal human b... Read More
Capacity :
Plant and Machinery cost:
131.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
58.00 %
TCI :
350.00 Lakhs
Cost of Project :
350.00Lakhs
Add To Inquiry Basket
SODIUM TRI POLY PHOSPHATE
SODIUM TRI POLY PHOSPHATE

PRODUCT PROFILE: Sodium triphosphate (STP) is an inorganic compound with formula Na5P3O10. It is the sodiumsalt of the polyphosphate penta anion, ... Read More

Capacity :
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Curcumin(Turmeric) The Indian solid gold
Curcumin(Turmeric) The Indian solid gold

PRODUCT PROFILE Curcumin is the principal curcuminoid of the popular Indian spice turmeric, which is a member of the ginger family. It is the main ... Read More

Capacity :
23400 Kg/Annum, Curcumin 23400 kg/Annum, Turmeric oil 550 MT/ Annum, De-oiled turmeric powder
Plant and Machinery cost:
122.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
54.00%
Break Even Point (BEP):
51.00 %
TCI :
289.00 Lakhs
Cost of Project :
289.00Lakhs
Add To Inquiry Basket
SODIUM PETROLEUM SULFONATE
SODIUM PETROLEUM SULFONATE

A sulfonate is a salt or ester of a sulfonic acid. It contains the functional group R-SO2O. Anions with the general formula RSO2O are called Sulfon... Read More

Capacity :
900 MT/Annum
Plant and Machinery cost:
122.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
55.00 %
TCI :
307.00 Lakhs
Cost of Project :
307.00Lakhs
Add To Inquiry Basket
E-WASTE RECYCLING PLANT
E-WASTE RECYCLING PLANT

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity :
-
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC SYRINGES WITH NEEDLES
DISPOSABLE PLASTIC SYRINGES WITH NEEDLES

Disposable syringes are a great inno... Read More

Capacity :
120 Lakhs/ Annum
Plant and Machinery cost:
90.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
48.00 %
TCI :
253.00 Lakhs
Cost of Project :
253.00Lakhs
Add To Inquiry Basket
Growing Prospects for Packaged Drinking Water Industry
Growing Prospects for Packaged Drinking Water Industry

Water everywhere, not a CLEAN drop to drink! Who would have thought that there will be a day when sanitation of available water would be more of a... Read More

Capacity :
30,000 Thousand Nos./Annum or 1,00,000 Bottles /day
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
63.00 %
TCI :
282.00 Lakhs
Cost of Project :
282.00Lakhs
Add To Inquiry Basket
Bio coal Briquettes from Agricultural Cellulosic Waste
Bio coal Briquettes from Agricultural Cellulosic Waste
Bio coal briquette is an ideal and best ready substitute to coal, fire wood, lignite etc. and easily replaces these conventional fuels for heating,... Read More
Capacity :
16 Ton / Day
Plant and Machinery cost:
23.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
53.00 %
TCI :
89.00 Lakhs
Cost of Project :
89.00Lakhs
Add To Inquiry Basket
VACUUM DISTILLATION OF CRUDE COAL TAR SPECIFICALLY CREOSOTE OIL
VACUUM DISTILLATION OF CRUDE COAL TAR SPECIFICALLY CREOSOTE OIL

For vacuum distillation of crude coal tar, the crude coal tar is produced from coke ovens of steel plant, 50% of this crude coal tar is pitch. The ... Read More

Capacity :
7500 MT / Annum
Plant and Machinery cost:
137.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
57.00 %
TCI :
320.00 Lakhs
Cost of Project :
320.00Lakhs
Add To Inquiry Basket
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask

Disposable needle is widely used by ... Read More

Capacity :
0
Plant and Machinery cost:
147.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
47.00 %
TCI :
426.00 Lakhs
Cost of Project :
426.00Lakhs
Add To Inquiry Basket
Charcoal From Coconut Shell
Charcoal From Coconut Shell

Charcoal and purity of any substances has now become a basic requirement of any chemical substance. So many products obtained by processing are dir... Read More

Capacity :
5 Tons/day
Plant and Machinery cost:
21.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
45.00 %
TCI :
107.00 Lakhs
Cost of Project :
107.00Lakhs
Add To Inquiry Basket
FERROALLOYS OF NIOBIUM, MOLYBDENUM, TITANIUM, TUNGSTEN AND VANADIUM
FERROALLOYS OF NIOBIUM, MOLYBDENUM, TITANIUM, TUNGSTEN AND VANADIUM

Ferroalloys are the principal alloying agents in iron and steel production. Addition of ferro alloys improves mechanical and physical properties of... Read More

Capacity :
5 MT/Day
Plant and Machinery cost:
200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
50.00%
Break Even Point (BEP):
41.00 %
TCI :
500.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
Paper Napkins
Paper Napkins

Tissue paper is often used for wrapping as in jewellery, liquors, fruits and florist trades etc. Napkins are manufactured from tissues. Paper napki... Read More

Capacity :
400 Kgs./ Day
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.88%
Break Even Point (BEP):
47.25 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Wooden Furniture (With Mediocre Automation)
Wooden Furniture (With Mediocre Automation)

The term wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings, and includes items such as chai... Read More

Capacity :
20 Articles/Day
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
28.00
Rate of Return (ROR):
42.81%
Break Even Point (BEP):
48.28 %
TCI :
73.00 Lakhs
Cost of Project :
73.00Lakhs
Add To Inquiry Basket
Bicycle Tyres
Bicycle Tyres

Bicycle tyre is the backbone of the cycle industries. There are few numbers of organized manufacturing companies are engaged in the quality grade c... Read More

Capacity :
4000 Nos./Day
Plant and Machinery cost:
36.00 Lakhs
Working Capital :
57.00
Rate of Return (ROR):
59.50%
Break Even Point (BEP):
38.47 %
TCI :
163.00 Lakhs
Cost of Project :
163.00Lakhs
Add To Inquiry Basket
Wooden Furniture
Wooden Furniture

The furniture making is an ancient art in India before centuries. The expertise of India in manufacturing furniture was accepted by all the parts o... Read More

Capacity :
20 Pcs/Day
Plant and Machinery cost:
4.00 Lakhs
Working Capital :
5.00
Rate of Return (ROR):
111.00%
Break Even Point (BEP):
26.99 %
TCI :
13.00 Lakhs
Cost of Project :
13.00Lakhs
Add To Inquiry Basket
Activated Charcoal From Wood
Activated Charcoal From Wood

Activated wood charcoal is a very important chemical widely employed by certain gases and vapours in purification in catalytic chemical reactions a... Read More

Capacity :
15MT/Day
Plant and Machinery cost:
80.00 Lakhs
Working Capital :
113.00
Rate of Return (ROR):
24.13%
Break Even Point (BEP):
62.30 %
TCI :
262.00 Lakhs
Cost of Project :
262.00Lakhs
Add To Inquiry Basket
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for Production of Ready Mix Plaster,  Block Jointer, Tile Adhesive  and M 20 Concrete (Micro Concrete)
Business Plan for Production of Ready Mix Plaster, Block Jointer, Tile Adhesive and M 20 Concrete (Micro Concrete)

 

Ready Mix Plaster is a mixture of cement paste... Read More

Capacity :
0
Plant and Machinery cost:
294.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1342.00Lakhs
Add To Inquiry Basket
Start Phosphate Rich Organic Manure (PROM) Production Business
Start Phosphate Rich Organic Manure (PROM) Production Business

 

Phosphate rice or... Read More

Capacity :
Phosphate Rich Organic Manure (PROM) 28,800 MT Per Annum
Plant and Machinery cost:
182.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
78.00 %
TCI :
0.00 Lakhs
Cost of Project :
359.00Lakhs
Add To Inquiry Basket
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business

Stainless steel cold rolled... Read More

Capacity :
0
Plant and Machinery cost:
2863.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
9293.00Lakhs
Add To Inquiry Basket
Setting up  Hemodialysis Blood Tubing  Business
Setting up Hemodialysis Blood Tubing Business

The introduction of hemodia... Read More

Capacity :
Homodialysis Blood Tubing Set 1,200,000 Pcs Per Annum
Plant and Machinery cost:
133.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
344.00Lakhs
Add To Inquiry Basket
Start Protein Based Nutrition Foods Production
Start Protein Based Nutrition Foods Production

 

Protein-based nut... Read More

Capacity :
Protein Based Nutrition Foods 1,200,000 Nos Per Annum (500 gms)
Plant and Machinery cost:
62.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
437.00Lakhs
Add To Inquiry Basket
A Business Plan for Soda Ash by Solvay process
A Business Plan for Soda Ash by Solvay process

 

Soda ash, also known as sodium carbonate, is a chemical compound produced when a base and an ac... Read More

Capacity :
Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl):200,000 MT Per Annum
Plant and Machinery cost:
14300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
21000.00Lakhs
Add To Inquiry Basket
Floral Foam (Phenolic Foam) with Resin Manufacturing Business
Floral Foam (Phenolic Foam) with Resin Manufacturing Business

 

Floral foam, also known as phenolic foam, is a lightweight, highly porous foam material used to hold and hyd... Read More

Capacity :
Floral Foam (Phenolic Foam): 90,000 Kg. Per Annum
Plant and Machinery cost:
84.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
366.00Lakhs
Add To Inquiry Basket
Setup Glass Fiber Reinforced Polymer (GFRP) Rebar Plant
Setup Glass Fiber Reinforced Polymer (GFRP) Rebar Plant

Glass Fiber Reinforced Polymer (GFRP) Rebar is a type of composite material that is made from combining glass fibers with a polymer matrix. This co... Read More

Capacity :
Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm): 360,000 MT Per Annum
Plant and Machinery cost:
588.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
6097.00Lakhs
Add To Inquiry Basket
Start Polyvinyl Alcohol Production business
Start Polyvinyl Alcohol Production business

Polyvinyl Alcohol (PVOH) is a synthetic polymer created through the polymerization of vinyl acetate. It is a water-soluble ... Read More

Capacity :
Polyvinyl Alcohol: 6,000 MT Per Annum
Plant and Machinery cost:
449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1193.00Lakhs
Add To Inquiry Basket
A Global Recycling Business, Setup Steel Ingot from Scrap to Reduce Landfill and Save the Environment
A Global Recycling Business, Setup Steel Ingot from Scrap to Reduce Landfill and Save the Environment

Paul Vaulting, an innovator... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
Recycling of Lithium Ion ... Copper 1.4 MT Per Day Aluminium 0.8 MT Per Day Graphite 1.8 MT Per Day Carbon Black 0.3 MT Per Day L 27.00 422.00
Set up Lithium Ion Batter... 0 0.00 0.00
12345678910...

Showing 181 - 240 of 652 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR